#1 in Distributing Specialty
Chemicals & Equipment

Email Us Today Free shipping on
all chemicals (48 states)

  Home > Boiler Piping >

Steam Boiler Piping Kit (Continuous Blowdown)
Boiler Piping
Boiler Blowdown Piping
 
Boiler Piping
Our Price: $598.00
Sale Price: $518.00
Savings: $80.00


Quantity in Stock:20

Free Shipping
Availability: Usually Ships in 2 to 3 Business Days
Product Code: CWPL6


Pipe Size*:


Qty:
Description Shipping & Transit Times
 

Boiler Sampling Pipe

This 1/2" and 3/4" NPT continuous plumbing kit is used for a continuous sampling of your steam boiler water. The lower orifice bleeds a small sample across the sensor. The upper orifice is used with the blowdown valve. The orifice restricts flow near the boiler sensor to prevent steam flashing during a sample. All the items in the above photo are included with this kit.

ChemWorld also supplies a complete continous & timed blowdown pipe kit option and a timed blowdown pipe kit.

Boiler orifice unions are milled for 1/2" and 3/4" NPT pipes and they are designed to fit boiler orifice plates. The purpose of a boiler orifice plate is to reduce the flow rate and to eliminate steam flashing over the controller conductivity probe. Without this steam flow restriction, false reading may be sent to your boiler blowdown controller, resulting in the steam boiler blowdown valve to power on/off repeatedly. Boiler globe valves may also be used in place of orifice plates and milled unions.

Improper control of your boiler blowdown controller will also increase blowdown rates, increased energy costs, and increase steam boiler chemicals use.
  • Part Number 1167297 for 1/2" Pipe.
  • Part Number 1167296 for 3/4" Pipe.

Share your knowledge of this product. Be the first to write a review »