|
Powdered Sodium Sulfite
Powdered Sodium Sulfite. Choose from 50 and 500 pound containers. Ideal from removing dissolved oxygen in boiler feed water and
dechlorination of water.
DESCRIPTION ChemWorld 731 is a powdered sodium sulfite which, when added to boiler feedwater, removes dissolved oxygen. By acting as an oxygen scavenger, ChemWorld 731 is used to control corrosion and pitting caused by the presence of dissolved oxygen. This product is best controlled with a sulfite test.
FEATURES AND BENEFITS Improves boiler system reliability and longevity. Removes corrosive oxygen from the boiler feedwater and boiler water.
PRODUCT FEED AND CONTROL ChemWorld 731 must be mixed in a chemical feed tank using good quality condensate, softened water, or feedwater. An agitator is required to assure complete dissolution of the product. ChemWorld 731 may be mixed with most common chemicals used for boiler treatment. Tanks, pumps, piping and valves should be made of stainless steel, polyethylene, or PVC. ChemWorld 731 is normally controlled by a sulfite test on the boiler water. Control ranges can vary widely depending upon both makeup water characteristics and system operating conditions and will be specified by the technical representative servicing the facility. The product should be feed near the water section of the DA tank or near the center of the feed water tank with a chemical injection quill.
PHYSICAL PROPERTIES Physical properties of ChemWorld 731 are shown on the Safety Data Sheet (SDS), a copy of which is available upon request.
STORAGE AND HANDLING Keep in a tightly closed container. Store indoors. Do not reuse container. Dispose of empty containers in compliance with federal, state/provincial and local laws and regulations.
ENVIRONMENTAL, HEALTH, AND SAFETY For detailed information, consult the safety data sheet (SDS).
PACKAGING ChemWorld 731 is available in a wide variety of customized containers and delivery methods. The most popular is 50 and 500 pound containers.
For new steam boiler startups, consider purchasing our
Steam Boiler Startup Kit.
This product is manufactured to order per ISO specifications. Lead time on production is 4 to 7 days. Free shipping transit time in business days as of May 2023 (after production). Remember production time is 4 to 7 days. This map is transit time. You will receive your tracking number within a week.
|
|
|