#1 in Distributing Specialty
Chemicals & Equipment

Email Us Today Free shipping on
all chemicals (48 states)

  Home > Cooling Water Chemicals > New Cooling Tower Startup >

Cooling Tower Complete Startup Kit
New cooling tower startups
New Cooling Tower Startup - Complete Startup Kit
 
Alternative Views:


Cooling Tower Startup Kit - Chemicals and Equipment
Our Price: $7,199.99
Sale Price: $5,999.99
Savings: $1,200.00

Quantity in Stock:4

Free Shipping
Availability: Usually Ships in 3 to 5 Business Days
Product Code: NEW-CT-101
Qty:

Description Shipping & Transit Times
 

New Cooling Tower Startup Kit

Easy order link. All items below included for your startup. It is very common upon start up of your cooling tower system or condenser system, the designer did nothing to prepare you for your water treatment. You are ready to start the system within a week and nothing was addressed. List here is an easy ordering link that provides and the required start up products you need to get started. ChemWorld 101 Cooling Start up kit includes the following:
  • One 5 gallon pail of ChemWorld Q-ALK-PC - This product is required to clean the debris and greases prior to startup.
  • One 5 gallon pail of ChemWorld 1334 - ChemWorld 1334 is scale and corrosion control cooling tower chemical. After startup you can perform testing of your water hardness and alkalinity and we can tune in your exact chemical for long term protection.
  • One 5 gallon pail of ChemWorld 56 - ChemWorld 56 is a 12.5% sodium hypochlorite product that is required to kill bacteria. This is the cheapest easiest product to get your system up and going, you can convert to tablets or a stablized bromide product after startup.
  • One LakeWood 140 Cooling Tower Controller - You will need to set the controller to feed and bleed the cooling tower water to maximize cycles and to minimize chemical usage rates. An optional dual biocide water treatment can be implemented after startup. This is model 1239597 (which is board mounted unit that has the flow assembly on the left).
  • One 1167435 Cooling Tower Blowdown Valve (1" NPT) - This will be required when the cooling tower calls to release cooling tower water.
  • Two Stenner 45MHP10 Adjustable Head Pumps - One pump is required for the corrosion/ scale prevention chemical and for the biocide. Each pump is rated to 100 psi, which should be enough to feed the chemical into the system. The ideal spot to feed the chemical is into the return header of the cooling tower. These Stenner Pump kits come with chemical injection valves that will allow for quick injection of each chemical into the side stream water loop that is used to monitor the cooling tower conductivity.
  • One complete CWTK-200 Cooling Water Treatment Test Kit. This kit is contains every test you will need to set up and fine tune your water treatment program.
  • One Chemical Metal Test Station Cabinet - You need to keep your test kits and lo sheets in one clean location. This test kit is ideal for cooling towers. Items in photo of test kit not included.
Frequently Asked Questions
How often are analysis performed on cooling towers? They are small towers but we use groundwater which is subject to scaling.
We generally recommend testing your water at least once a month to make sure the Cooling Tower Chemicals are within range to guarantee smooth operation.

Share your knowledge of this product. Be the first to write a review »