#1 in Distributing Specialty
Chemicals & Equipment

Email Us Today Free shipping on
all chemicals (48 states)

  Home > Cooling Water Chemicals > Water System Cleaners >

Galvanized Tower Chemical Cleaner - 5 Gallons
Cooling Tower Cleaner Chemical
ChemWorld 68C - Galvanized Tower Chemical Cleaner - 5 Gallons
 
Alternative Views:


ChemWorld 68C - Galvanized Tower Chemical Cleaner - 5 Gallons
Our Price: $349.99
Sale Price: $289.99
Savings: $60.00


Quantity in Stock:16

Free Shipping
Availability: Usually Ships in 3 to 5 Business Days
Product Code: CW-68C-5


Defoamer*:


Qty:
Description Shipping & Transit Times
 

Cooling Tower Cleaner

ChemWorld 68C is designed for cleaning galvanized metal cooling tower systems during seasonal start up.
  • Minimizes rapid corrosion of the new galvanized cooling towers referred to as white rust.
  • Removes deposition of dirt and debris in the piping and heat exchange equipment.
  • Cleans microbiological control issues.
  • Remove soiling from oil and greases.
The recommended feed rate for ChemWorld 68C is 200-300 ppm or 4 pounds of ChemWorld 68C per every 1000 gallons of cooling system volume.

A 5-gallon pal of ChemWorld 68C is enough to clean most galvanized cooling systems. Please be aware that the product can foam and some defoamer should be available when the product is used. Please refer to the Technical Bulletin for recommended procedures for using the product.
For all new cooling tower startups, consider our ChemWorld 101 Cooling Startup Kit. This kit includes the following:
  • One 5 gallon pail of ChemWorld Q-ALK-PC - This product is required to clean the debris and greases prior to startup.
  • One 5 gallon pail of ChemWorld 1334 - ChemWorld 1334 is scale and corrosion control cooling tower chemical. After startup, you can perform testing of your water hardness and alkalinity and we can tune in your exact chemical for long-term protection.
  • One 5 gallon pail of ChemWorld 56 - ChemWorld 56 is a 12.5% sodium hypochlorite product that is required to kill bacteria. This is the cheapest easiest product to get your system up and going, you can convert to tablets or a stabilized bromide product after startup.
  • One LakeWood 140 Cooling Tower Controller - You will need to set the controller to feed and bleed the cooling tower water to maximize cycles and to minimize chemical usage rates. An optional dual biocide water treatment can be implemented after startup. This is model 1239597 (which is board mounted unit that has the flow assembly on the left).
  • One 1167435 Cooling Tower Blowdown Valve (1" NPT) - This will be required when the cooling tower calls to release cooling tower water.
  • Two Stenner 45MHP10 Adjustable Head Pumps - One pump is required for the corrosion/ scale prevention chemical and for the biocide. Each pump is rated to 100 psi, which should be enough to feed the chemical into the system. The ideal spot to feed the chemical is into the return header of the cooling tower. These Stenner Pump kits come with chemical injection valves that will allow for quick injection of each chemical into the sidestream water loop that is used to monitor the cooling tower conductivity.
  • One complete CWTK-200 Cooling Water Treatment Test Kit. This kit contains every test you will need to set up and fine tune your water treatment program.
  • One Chemical Metal Test Station Cabinet - You need to keep your test kits and lo sheets in one clean location. This test kit is ideal for cooling towers. Items in the photo of test kit not included.

Share your knowledge of this product. Be the first to write a review »